Challenger Class Cruiser (1902)
From The Dreadnought Project
Jump to navigationJump to searchThe two cruisers of the Challenger class were completed in 1904 and 1905.
Overview of 2 vessels | |||||
---|---|---|---|---|---|
Citations for this data available on individual ship pages | |||||
Name | Builder | Laid Down | Launched | Completed | Fate |
Challenger | Chatham Royal Dockyard | 1 Dec, 1900 | 27 May, 1902 | 3 May, 1904 | 31 May, 1920 |
Encounter | Devonport Royal Dockyard | 28 Jan, 1901 | 18 Jun, 1902 | 21 Nov, 1905 | to R.A.N. Jul, 1912 |
Armament
Guns
In February, 1913, the 6-in mountings, along with many other 4-in and 6-in mountings in various capital ships and cruisers were to have illumination added for their training index racers.[1]
Torpedoes
- two submerged 18-in torpedo tubes arranged on the broadside forward, depressed 3 degrees and bearing abeam; axis of tube was 6 foot 6 inches below load water line and 1 feet 8 inches above deck.[2]
See Also
Footnotes
Bibliography
Challenger Class Second Class Protected Cruiser | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Challenger | Encounter | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
<– | Highflyer Class | Minor Cruisers (UK) | Gem Class | –> |