U.S.S. N-3 (1917)
From The Dreadnought Project
Jump to navigationJump to search
U.S.S. N-3 (1917) | |
---|---|
Hull Number: | SS-55 |
Builder: | Seattle Construction & Drydock[1] |
Laid down: | 31 Jul, 1915 |
Launched: | 21 Feb, 1917[2] |
Commissioned: | 26 Sep, 1917 |
Decommissioned: | 30 Apr, 1926 |
Broken up: | 1931[3] |
U.S.S. N-3 was one of seven "N" Class submarines completed for the U.S. Navy.
Service
N-3 was commissioned on 26 September, 1917 under the command of Lieutenant William R. Munroe. She was to be the last submarine constructed in Seattle.
Captains
- Lieutenant William R. Munroe, 26 September, 1917
- Lieutenant John W. Rowe, before 1 January, 1922[4]
- Lieutenant (Junior Grade) George K. G. Reilly, before 1 January, 1925[5]
See Also
Footnotes
Bibliography
"N" Class Submarine | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
N-1 | N-2 | N-3 | N-4 | N-5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
N-6 | N-7 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
<– | U.S.S. M-1 | Submarines (US) | "O" Class | –> |