U.S.S. Eagle 30 (1919)
From The Dreadnought Project
Jump to navigationJump to search
U.S.S. Eagle 30 (1919) | |
---|---|
Hull Number: | PE-30 |
Builder: | Ford Motor[1] |
Laid down: | 19 Nov, 1918[2] |
Launched: | 8 Mar, 1919[3] |
Completed: | 14 Aug, 1919[4] |
Commissioned: | 14 Aug, 1919[5] |
Transferred: | 1919[6] |
Fate: | Coast Guard |
U.S.S. Eagle 30 was one of sixty Eagle Class patrol craft completed for the U.S. Navy.
Service
Captains
See Also
Footnotes
Bibliography