Difference between revisions of "H.M.S. Renown (1916)"
From The Dreadnought Project
m |
|||
Line 6: | Line 6: | ||
|- | |- | ||
|Pendant Number: | |Pendant Number: | ||
− | |23 (April, 1918) | + | |23 (April, 1918)<ref>Dittmar & Colledge.</ref> |
|- | |- | ||
|Built By: | |Built By: | ||
Line 29: | Line 29: | ||
==Alterations== | ==Alterations== | ||
+ | ''Renown'' was completed with her main battery director in place, but had her secondary battery director system installed in Oxctober, 1916 — one month after she entered service.<ref>''The Technical History and Index: Fire Control in HM Ships'', pp. 9-11, 16.</ref> | ||
==See Also== | ==See Also== | ||
Line 38: | Line 39: | ||
==Bibliography== | ==Bibliography== | ||
<small> | <small> | ||
+ | *{{BibUKFireControlInHMShips1919}} | ||
*{{BibDittmarColledge}} | *{{BibDittmarColledge}} | ||
*{{BibRobertsBattlecruisers}} | *{{BibRobertsBattlecruisers}} |
Revision as of 10:18, 27 September 2009
H.M.S. Renown | |
Career | Details |
---|---|
Pendant Number: | 23 (April, 1918)[1] |
Built By: | Fairfield, Govan |
Laid Down: | 25 January, 1915 |
Launched: | 4 March, 1916 |
Commissioned: | 20 September, 1916 |
Sold: | 19 March, 1948 |
Fate: | Scrapped |
Contents
Alterations
Renown was completed with her main battery director in place, but had her secondary battery director system installed in Oxctober, 1916 — one month after she entered service.[2]
See Also
Footnotes
Bibliography
- Template:BibUKFireControlInHMShips1919
- Dittmar, F.J.; Colledge, J.J. (1972). British Warships 1914–1919. London: Ian Allan.
- Template:BibRobertsBattlecruisers