Emerald Class Cruiser (1920)

From The Dreadnought Project
Revision as of 15:52, 1 October 2009 by Tone (Talk | contribs)

Jump to: navigation, search

The two light cruisers of the Emerald Class were completed in 1926. A third vessel, Euphrates, was not completed.

Fire Control

Rangefinders

Evershed Bearing Indicators

These ships almost certainly had Evershed gear for gun control from delivery, and would also feature Evershed installations for searchlight control after orders for such installations from February 1917.[1]

Gunnery Control

Control Positions

Control Groups

Directors

All ships were completed with gunnery directors in place.[2]

Torpedo Control

Transmitting Stations

Dreyer Table

Fire Control Instruments

[TO BE CONTINUED - TONE]

See Also

Footnotes

  1. The Technical History and Index: Fire Control in HM Ships, 1919, p. 29.
  2. The Technical History and Index: Fire Control in HM Ships, 1919, p. 11.

Bibliography

Template:Emerald Class (1920)