H.M.S. Inconstant (1914): Difference between revisions

From The Dreadnought Project
Jump to navigationJump to search
(standardise on listing captains under ==Captains==)
Line 33: Line 33:
In 1915 or 1916, she trialed a [[Wise Pressure Telegraphy System Type A]] for torpedo control.  As a result of this trial, in 1917 she was to have her system upgraded to the [[Wise Pressure Telegraphy System Type C|Type C]] standard.
In 1915 or 1916, she trialed a [[Wise Pressure Telegraphy System Type A]] for torpedo control.  As a result of this trial, in 1917 she was to have her system upgraded to the [[Wise Pressure Telegraphy System Type C|Type C]] standard.


==Commanding Officers==
==Captains==
Dates of appointment given:
Dates of appointment given:



Revision as of 18:56, 21 August 2012

H.M.S. Inconstant
Career Details
Pendant Numbers: 5A (1914)
73 (Jan 1918)
77 (Apr 1918)[1]
Built By: Beardmore
Laid Down:
Launched: 6 July, 1914
Commissioned:
Sold:
Fate:

Alterations

Inconstant was fitted with a director in March, 1918. This alteration required her pole mast to be replaced with a tripod mast for greater rigidity.[2]

In 1915 or 1916, she trialed a Wise Pressure Telegraphy System Type A for torpedo control. As a result of this trial, in 1917 she was to have her system upgraded to the Type C standard.

Captains

Dates of appointment given:

See Also

Footnotes

  1. Dittmar; Colledge. British Warships: 1914-1919. p. 47.
  2. The Technical History and Index: Fire Control in HM Ships, 1919, pp. 11-12.
  3. The Navy List (October, 1915). p. 395.
  4. The Navy List (December, 1918). p. 819.

Bibliography

Template:Arethusa Class (1913)