Difference between revisions of "H.M.S. Agincourt (1913)"

From The Dreadnought Project
Jump to navigationJump to search
(Made Changes.)
(Made Changes.)
Line 1: Line 1:
 +
{|align="right" border="2" cellpadding="2" cellspacing="0" style="margin: 0 0 1em 0.5em; background: #f9f9f9; border: 1px #aaa solid; border-collapse: collapse; font-size: 95%;" width="300"
 +
|align="center" colspan="2"|'''H.M.S. ''Agincourt'''''
 +
|-
 +
!style="color: white; height: 30px; background: crimson;"| Career
 +
!style="color: white; height: 30px; background: crimson;"| Details
 +
|-
 +
|Pennant:
 +
|09 (April, 1918)
 +
|-
 +
|Built By:
 +
|[[Armstrongs, Elswick]]
 +
|-
 +
|Laid down:
 +
|[[14 September]], [[1911]]
 +
|-
 +
|Launched:
 +
|[[22 January]], [[1913]]
 +
|-
 +
|Commissioned:
 +
|[[7 August]], [[1914]]
 +
|-
 +
|Sold:
 +
|[[19 December]], [[1922]]
 +
|-
 +
|Fate:
 +
|Scrapped
 +
|-
 +
|}
 +
 +
Officially job 690A.
 +
 
Fitted with a Mark I Dreyer Fire Control Table.  She was fitted with a main armament director in June-July, 1916 while at [[Portsmouth Royal Dockyard]].
 
Fitted with a Mark I Dreyer Fire Control Table.  She was fitted with a main armament director in June-July, 1916 while at [[Portsmouth Royal Dockyard]].
  

Revision as of 10:17, 23 June 2009

H.M.S. Agincourt
Career Details
Pennant: 09 (April, 1918)
Built By: Armstrongs, Elswick
Laid down: 14 September, 1911
Launched: 22 January, 1913
Commissioned: 7 August, 1914
Sold: 19 December, 1922
Fate: Scrapped

Officially job 690A.

Fitted with a Mark I Dreyer Fire Control Table. She was fitted with a main armament director in June-July, 1916 while at Portsmouth Royal Dockyard.

Template:HMS Agincourt Class (1913)