Difference between revisions of "Blake Class Cruiser (1889)"

From The Dreadnought Project
Jump to navigationJump to search
(correcting data block outlining 2 ships)
(using new CatClass templates)
Line 55: Line 55:
 
{{DEFAULTSORT:Blake}}
 
{{DEFAULTSORT:Blake}}
  
{{CatClassUKFirstClassProtectedCruiser}}
+
{{CatClassFirstClassProtectedCruiser|UK}}
  
  

Revision as of 18:26, 16 August 2012

The two protected cruisers of the Blake Class were completed between 1892 and 1894.

Name Builder Laid Down Launched Commissioned Fate
Blake Chatham Royal Dockyard July, 1888 23 November, 1889 2 February, 1892 Sold 9 June, 1922
Blenheim Thames Iron Works October, 1888 5 July, 1890 26 May, 1894 Sold 13 July, 1926

Armament

Torpedoes

In 1896, Blenheim had a torpedo hang up on firing from a submerged tube. It eventually was fired from the bar, but broke up and sank. The issue was determined to be soft metal used in the construction of "stops", and harder metal was to replace these fittings.[1]

Dreyer Table

These ships had no fire control tables.[2]

Fire Control Instruments

See Also

Footnotes

  1. Annual Report of the Torpedo School, 1896, p. 39.
  2. absent from list in Handbook of Capt. F.C. Dreyer's Fire Control Tables, p. 3.

Bibliography


Template:Blake Class (1889)